Square 54/The Avenue & 2200 Pennsylvania Avenue Regulatory Filings
October 12, 2007 Zoning Commission Order of Approval for Square 54 Planned Unit Development
April 9, 2007 supplemental filing in connection with Square 54 Planned Unit Development
- The 04-09-07 submission is available online in two parts: cover letter (.pdf) and images (.pdf).
March 12, 2007 supplemental filing in connection with Square 54 Planned Unit Development
- The 03-12-07 submission is available online in two parts: cover letter (.pdf) and Exhibit A (.pdf).
February 1, 2007 filing to Zoning Commission regarding Proposed Order for Square 54 Planned Unit Development
- The 02-01-07 Proposed Findings of Fact, Conclusions of Law, And Conditions of Approval submission is available online here: cover letter (.pdf) and document (.pdf).
January 25, 2007 supplemental filing to Zoning Commission on Square 54 Planned Unit Development
- Due to file size of color exhibits, the 01-25-07 submission is available online here in multiple parts: cover letter (.pdf); Exhibit A (.pdf) (office component); Exhibit B (.pdf) (residential component/preferred design; Exhibit C (.pdf) (residential component/alternative design); Exhibit D (.pdf) (22nd Street perspectives); Exhibit E (.pdf) (courtyard gate).
December 26, 2006 supplemental filing to Zoning Commission on Square 54 Planned Unit Development
- The 12-26-06 submission is available here in multiple parts: cover letter (.pdf); Exhibit A (.pdf) (project renderings); Exhibit B (.pdf) (height study diagrams); Exhibit C (.pdf) (curb cut diagram); Exhibit D (.pdf) (photos of material boards); Exhibit E (.pdf) (area grocery store diagrams); Exhibits F & G (.pdf) (WMATA Ridership Survey modal splits and Proposed Condition regarding construction).
November 20, 2006 presentation at the Zoning Commission public hearing on Square 54 Planned Unit Development
- The 11-20-06 powerpoint presentation is available online in three parts: part 1 (.pdf) and part 2 (.pdf) and part 3 (.pdf).
October 31, 2006 20 Day Pre-Hearing Submission for Square 54 Planned Unit Development
- The 10-31-06 20 Day Pre-Hearing Submission is available online here. Due to the large file size, this document has been divided into the following multiple parts.
- Introduction (.pdf)
- Exhibit A/Site Plans1: page 1 (.pdf) of 3; page 2 (.pdf) of 3; page 3 (.pdf) of 3.
- Exhibit A/Elevation Drawings: page 1 (.pdf) of 4; page 2 (.pdf) of 4; page 3 (.pdf) of 4; page 4 (.pdf) of 4.
- Exhibit A/Elevation Models: page 1 (.pdf) of 4; page 2 (.pdf) of 4; page 3 (.pdf) of 4; page 4 (.pdf) of 4.
- Exhibit B/Transportation Impact Study: part 1 (.pdf) of 2; part 2 (.pdf) of 2
- Exhibit C/Team Information (.pdf)
July 14, 2006 Square 54 Planned Unit Development 60 Day Pre-Hearing Submission
May 30, 2006 Square 54 Planned Unit Development Documents
- The 05-30-06 Square 54 Planned Unit Development document is available here. Due to the large file size, this document has been divided into the following multiple parts.
- Part 1 (.pdf)/Main Text.
- Part 2/Transportation Impact Study: Part 2a (.pdf), pages 1-21; Part 2b (.pdf), pages 22-31; Part 2c (.pdf), pages 32-42.
- Part 3/Site Plans: Part 3a (.pdf), pages 1-6; Part 3b (.pdf), pages 7-12; Part 3c (.pdf), pages 13-24; Part 3d (.pdf), pages 25-36.
- Part 4 (.pdf)/Advisory Services Report.
- Part 5 (.pdf)/Appendix A – Existing Vehicular Traffic Counts.
- Part 6 (.pdf)/Appendix B – Existing Pedestrian Counts.
- Part 7 (.pdf)/Appendix C – Existing Intersection Levels of Service.
- Part 8 (.pdf)/Appendix D – Pipeline Trip Generation Summary.
- Part 9 (.pdf)/Appendix E – Background Future Intersection Levels of Service.
- Part 10/Appendix F – Total Future Intersection Levels of Service: Part 10a (.pdf), pages 1-20; Part 10b (.pdf), pages 21-41.